Valley Bridge Scarborough – Castings Replacements

H. Goodwin recently won a contract to replace the castings on Valley Bridge in Scarborough.  We are to produce inner and outer fascias at walkway level as well as handrail caps.

Our involvement is to manufacture pattern equipment to drawings and in conjunction with existing parts to produce the new castings.

At the moment, the inner and outer fascias are in production and are being shipped to a holding depot in Scarborough.

We will be posting progress updates and pictures in due course, from castings manufacture through to the finished product.

 

 

Share this:

Comments are closed.